Implementing- Total Productive
Management/Maintenance (TPM).
By Stephen Obiji.
1. To build profitable cooperate culture.
2. To maximize effectiveness within an organization.
3. To adopt preventive philosophy and eliminate loses, breakdown and
failure.
4. To involve all the workforce and members of the organization.
5. To ensure employee convenience.
To achieve the
aims of TPM, areas of improvement are:
1. Productivity-P.
2. Quality – Q
3. Cost- C
4.
Delivery- D
5. Safety- S
6. Morale - M
PQCDSM, 5 and 6 are Human
Related.
INTRODUCTORY NOTE ON THE AREAS OF IMPROVEMENT.
PRODUCTIVITY: Though the human related aspect of
Productivity is more of Performance Management System (PMS) which I will cover
in the course of this presentation.
Productivity in TPM
introduces ways to;
1.
Eliminate Loses or Wastes
of; (a) Materials (b) Time-: To start, Redo, Rework, Replace, Repeat, Rewrite….
2.
Prevent total breakdown or
failure by scheduling planned/preventive maintenance.
3.
Training the employee to
understand; the Standard Operating Procedure (SOP), Job Processes and his
machine (manual).
QUALITY: I will present; Total Quality Management,
Six Sigma and the Implementation of ISO, under Total Quality Management as part
of ‘focused management initiative’ which I had recommended for your
organization in my previous presentation.
TPM uses a focused and detailed approach to achieve
Quality of Product and Quality of Service at a Low Cost. In TPM, we believe
that Quality must not be capital dependent.
Reduction in the Cost of Production-cum-improved
quality is as good as enhanced Quality Service delivery at a reduced Delivery
time.
The way to Quality is to Set a Standard/Procedure/Specification/Benchmark
and being able to measure/determine, achieve and continuously sustain it,
without variation.
Examples: 1. A customer can be disappointed if the
process/procedure of making transaction with a particular organization defers
at different branches of the same organization.
2.
I enjoyed the taste and texture of a particular Baked Bread, on first trial,
but was later disappointed when the same product brand felt and tasted
differently at several occasions.
The difference between Quality Control (QA) and
Quality Assurance (QA) will be explained in my subsequent presentations.
Safety and Morale of the employee are paramount to
sustain the driving force of the Organization.
Apart from the general view that remuneration boosts
Morale, Japanese introduced the ‘Gemba Walk’, which requires that top
management personnel and Directors can make out time to Visit the Field and the
employee at the work place and if possible help or encourage them.
Example: 1. During my Pre Degree Work Experience as
a Polymer Extrusion Machine Operator, the Director then made out time to
understand the challenges we were facing and even helped in dismantling a full
Polymer Roll from the Machine/Roller.
2. Mr.
Mittal of Global Steel, most of the time (during Gemba Walk) is hardly distinguished
from his employees at the Steel Melting Shop (SMS), Continuous Casting Section,
or the Rolling Mill.
3. At my first Post Degree work, my morale
was boosted when the Head of Sales in Tell Communication called me at the field,
while I was building customer based subscriptions.
‘Safety, Health and Environment’ is one of the Eight
Pillars of TPM which I will present next...
You are Welcome to my blog, I will keep updating.